완성된 단조 부품을 검사하는 품질 검사관

ASTM A182 F22 플랜지에 대한 제3자 검사 완료

프로젝트 뉴스Published: 3 팔월 2026SASA FLANGE Project Team
Project completed

Third-party inspection has been completed for an ASTM A182 F22 flange order. The independent inspector reviewed traceability and material records, witnessed selected verification activities and confirmed dimensional, 임사체험, marking and packing requirements against the approved inspection and test plan.

Project snapshot

Project status Third-party inspection completed
재료 ASTM A182 F22 forged alloy steel
플랜지형 용접 목, slip-on and blind
Standard ASME B16.5
Pressure class Class 300–900
크기 범위 NPS 2–16
점검 MTC review, PMI, 경도, UT, 치수, marking and packing
Application Petrochemical process piping

Delivery highlights

Hold and witness points followed the purchaser-approved ITP.
Physical markings were cross-checked against heat and inspection records.
Release was documented before preservation and packing were closed.

What the independent inspector reviewed

The review began with the purchase order, approved drawings, material certificates and inspection and test plan. Heat numbers on the flanges were matched to records before selected PMI, hardness and NDE results were accepted. Calibration status and report identification were included in the document review.

Dimensional inspection covered the characteristics identified by flange type, including drilling, 깃 달기, 두께, hub or bore details and marking. The inspector also reviewed the visible condition of gasket faces and weld preparations.

From inspection release to packing

Third-party involvement does not transfer design responsibility or replace the manufacturer’s quality system. It provides independent evidence that the defined hold or witness points were completed. Any observations are resolved through the project procedure before release.

After acceptance, sealing faces were covered and the packing list was reconciled with the released quantities and identification. Inspection records were compiled into the final manufacturing record book as required.

Information needed for a comparable RFQ

A comparable inquiry should identify the exact material specification and grade, 관리 표준 및 에디션, NPS, 압력 등급, 플랜지형, 깃 달기, 보어 또는 일치하는 파이프 일정, quantity and destination. For this project-news scope, the key reference points were ASTM A182 F22 forged alloy steel, 용접 목, slip-on and blind, Class 300–900 그리고 NPS 2–16.

State the required EN 10204 certificate type, heat-number traceability, PMI extent, 경도 한계, 치수 보고서, NDE method and acceptance standard, third-party witness points, packing method and required delivery date at quotation stage. Early definition allows manufacturing, inspection and document schedules to be reviewed together.

Production, inspection and packing photos

Images show the relevant SASA FLANGE production, quality-control and shipment stages used for this project-news report.

자주 묻는 질문

Does third-party inspection replace the manufacturer’s inspection?

아니요. It independently witnesses or reviews defined activities; the manufacturer remains responsible for its quality controls and contractual compliance.

What is an ITP hold point?

A hold point is a stage that cannot proceed until the required party has reviewed or released it under the approved inspection and test plan.

Can the inspection scope be added after production?

Some reviews may be possible, but witness points and test extent should be agreed before manufacturing to avoid unavailable evidence or rework.